/cs-capacity-plan¶
Run the capacity-planner skill on this input:
$ARGUMENTS
Three-tool workflow¶
-
capacity_modeler.py— Erlang-C / queueing math: required FTE at 70/80/90% utilization, P(SLA breach) per utilization level, capacity headroom. Industry tuning--profile {support,cx,bizops,finance-ops,it-ops}. -
utilization_analyzer.py— Red-zone detection per team member: >85% sustained = throughput collapse (Little's Law), <40% = under-loaded or wrong skills, variance >30% = unbalanced. Verdict: HEALTHY / SQUEEZED / OVERLOADED / UNBALANCED. -
hiring_sequencer.py— 12-month quarterly hiring plan accounting for ramp curve (50% productive weeks 1-N, 100% after) + attrition + growth. Surfaces "manager trigger" point (span of control >7-8 ICs).
Hard rule¶
Never plan to 100% utilization. Reinertsen 2009: utilization >80% in knowledge work destroys throughput via queueing.
Distinct from¶
c-level-advisor/vpe-advisor— engineering throughput specifically. Capacity-planner is for non-eng ops teams.c-level-advisor/chro-advisor— strategic workforce planning. Capacity-planner is tactical sizing.business-operations/skills/process-mapper(sibling) — finds the bottleneck. Capacity-planner sizes the team around it.project-management/*— delivery tracking. Capacity-planner is forward sizing.